First Key was tasked with the job to improve productivity and cost efficiencies for a 1.2 million hL/yr operation involving a complex mix of bottle, can, PET and keg sizes for beer, soft drinks and malt. This involved an evaluation of current line layouts, capacities, operations, and material handling. We delivered detailed recommendations for high efficiency layouts, increased line utilizations, changeovers, maintenance, palletizing, maximizing production time and manpower reduction – leading to improved efficiencies and a significant reduction in the overall cost of operation.