When faced with an unexpected challenge, the Client, a US-based brewery, was compelled to relocate due to a non-renewed lease, threatening both operational continuity and future growth. The situation demanded not only a rapid response but also a strategic vision to turn adversity into opportunity. The Client needed a new facility that would meet immediate production requirements while laying the foundation for long-term expansion, all under the pressure of minimizing downtime and financial impact.
First Key worked closely with the Client’s architects and MEP firms to design a 20 bbl brewery, integrating existing equipment where feasible and recommending targeted upgrades to optimize capacity and quality. Our team prioritized site-specific considerations, utility requirements, permitting, and environmental compliance, to ensure a seamless transition. By deploying advanced tools including AutoCAD and utility calculators, we delivered precise, actionable plans that met prescribed timelines and supported operational resilience.
The Client gained a future-ready brewery designed for adaptability and scalability, positioning them for sustained growth in a competitive market. The project not only minimized operational disruption but also elevated the Client’s brand and brewing capabilities. With the new facility, the Client is projected to extend production capacity through 2026, unlocking new market opportunities and reinforcing their commitment to quality and innovation. Partnering with First Key enabled the Client to convert a forced relocation into a catalyst for business advancement, demonstrating the measurable impact of expert consulting and collaborative execution.
